THE PRACTICAL TAKEAWAY

Check the aircraft, the operation, the location and image-capture requirements separately. A farm boundary is not an airspace permission.

Before planning regular drone flights on a Portuguese farm, establish which rules apply to the actual operation. The aircraft’s weight and class, how it will be flown, the location and whether it captures images can all matter. Owning the land does not settle those questions.

This is an orientation guide, checked against the official sources linked below on 4 October 2026. It is not a flight authorisation or an exhaustive statement of the law. Confirm current requirements for the proposed operation with the relevant authorities before flying.

Identify the operating category

EASA’s open-category guidance explains the framework for lower-risk operations. Eligibility depends on the full set of conditions, including the aircraft and applicable subcategory. Do not infer eligibility from the fact that a mission is agricultural or takes place away from a city.

If the proposed operation falls outside open-category conditions, investigate the applicable specific-category route before committing to the equipment or schedule. A long-range mission and a short supervised check near the launch point may require quite different planning.

Use ANAC for Portuguese operational requirements

ANAC’s open-category page sets out general conditions including visual line of sight and a normal maximum height of 120 metres above the terrain. It also describes additional restrictions and exceptions. The headline height limit is not permission to fly anywhere up to that height.

Use ANAC’s current guidance to establish operator-registration and remote-pilot competency requirements for the aircraft and activity. Record the applicable category, subcategory and supporting documents in your operating plan. Verify that any training or registration you rely on is valid for the proposed operation.

Check the exact location before each operation

Consult ANAC’s geographical-zone information and the official information applicable to the intended place and time. Nearby aerodromes, controlled or restricted areas and temporary conditions can affect an otherwise familiar route.

Keep the area and timing of the proposed mission clear enough to assess. A pin at the farmhouse is not a description of a route across several parcels. Review the whole operational area, including transit and return, and retain the relevant permissions where required.

Treat aerial imagery as a separate check

Portugal also has requirements concerning aerial surveys and image capture. Review the Autoridade Aeronáutica Nacional’s aerial-survey guidance and its applicable procedures. Do not assume an acceptable flight category automatically resolves image-capture requirements.

Plan how to avoid unnecessary capture of neighbouring properties or identifiable people, and establish how collected material will be handled. Airspace access, aerial-imagery requirements and personal-data responsibilities are separate issues; one approval does not answer all three.

Do not confuse a programmed route with permission for unattended flight

EASA states that automatic and autonomous operations are different, and autonomous operations are not allowed in the open category. A dock, a saved route or a scheduled launch does not remove the need to establish the correct operating framework.

Before discussing remote daily missions, write down who is responsible, how supervision works, how intervention is possible and how abnormal situations are handled. Take that specific operational description to the relevant authority or a suitably qualified adviser rather than asking whether a particular brand is “legal”.

Keep a clear pre-operation record

A practical record brings together the proposed area and time, aircraft identification, applicable operating conditions, pilot and operator details, location checks and any necessary permissions. Update it when the operation changes. Use the official sources as the reference, and treat this guide as a way to organise the questions.

About these guides

Published by Curvature Robotics, currently in development. Guidance describes evaluation methods and industry concepts; it does not certify a flight plan or promise released product features. External references were checked at publication.